Log |
Last updated: 20 September 2013 |
K-350 Submersible Build Diary |
Through Hulls |
Nearly done. |
Lathe |
Repaired. |
Battery Pods |
Pipes Arrive. |
New Welder 2 |
New MMA\TIG welder has arrived. |
Hatch |
Hinge Bracket is Complete. |
Hatch |
Threading the Hinge Bar. |
Hatch |
Hinge Bar in Place. |
Hatch |
Springs. |
Arrival of Parts |
Lots of Parts have Arrived. |
VBT |
Thread Cutting. |
VBT |
Threads Cut. |
VBT |
VBT Tank Head. |
VBT |
Facing the HP inlet. |
Paint |
Paint has Arrived. |
VBT |
Finishing the HP inlet. |
VBT |
VBT Head Complete. |
VBT |
VBT Initial Welding. |
VBT |
VBT Final Welding. |
VBT |
VBT Internal Paint. |
VBT |
VBT Painted. |
VBT |
VBT Internal Paint.. |
VBT |
VBT Brackets. |
VBT |
VBT is Complete.. |
VBT |
Swagelok Through Hull. |
Battery Pods |
Vents. |
Battery Pods |
Battery pod endcaps lip. |
Dome |
Dome rings have Arrived. |
Battery Pods |
Preparing the Cladding. |
Submersible Build Log |