K-350 Submersible Build Diary |

|
Through Hulls |
|
Nearly done. |
|
Lathe |
|
Repaired. |
|
Battery Pods |
|
Pipes Arrive. |
|
New Welder 2 |
|
New MMA\TIG welder has arrived. |

|
Hatch |
|
Hinge Bracket is Complete. |
|
Hatch |
|
Threading the Hinge Bar. |
|
Hatch |
|
Hinge Bar in Place. |
|
Hatch |
|
Springs. |
|
Arrival of Parts |
|
Lots of Parts have Arrived. |

|
VBT |
|
Thread Cutting. |
|
VBT |
|
Threads Cut. |
|
VBT |
|
VBT Tank Head. |
|
VBT |
|
Facing the HP inlet. |

|
Paint |
|
Paint has Arrived. |
|
VBT |
|
Finishing the HP inlet. |
|
VBT |
|
VBT Head Complete. |
|
VBT |
|
VBT Initial Welding. |

|
VBT |
|
VBT Final Welding. |
|
VBT |
|
VBT Internal Paint. |
|
VBT |
|
VBT Painted. |
|
VBT |
|
VBT Internal Paint.. |

|
VBT |
|
VBT Brackets. |
|
VBT |
|
VBT is Complete.. |
|
VBT |
|
Swagelok Through Hull. |
|
Battery Pods |
|
Vents. |

|
Battery Pods |
|
Battery pod endcaps lip. |
|
Dome |
|
Dome rings have Arrived. |
|
Battery Pods |
|
Preparing the Cladding. |
|
Submersible Build Log |