Battery Pods |
12/11/08 |
On the left is the completed 1/2” through hull. I have also started to make the components for the battery pods. I have turned down these pieces of 1 1/2” sched 80 pipe to the required 5 1/2” and they are ready for the taper BSP thread for the pipe caps. |
Submersible Build Log |