Battery Pods

12/11/08

On the left is the completed 1/2” through hull.  I have also started to make the components for the battery pods.  I have turned down these pieces of 1 1/2” sched 80 pipe to the required 5 1/2” and they are ready for the taper BSP thread for the pipe caps.

Submersible Build Log