K-350 Submersible Build Diary

Submersible Build Log

Seat

Previous Seat Attempt.

MBT

Main Tanks Taking Shape.

Instruments

Some of the Instruments Fitted.

Instruments

OTS Kit.

Instruments

Motor Controllers Moved.

Grit Blasting

Masking Up.

Grit Blasting

Crane Lift.

Grit Blasting

Blasting Shed.

Painting

Back Home.

Painting

Sanded for Next Coat.

Painting

Third Coat Applied.

MBT

Mould For MBT.

MBT

Two Tanks Complete.

MBT

All Tanks Complete, for Now.

Painting

Inside Complete.

Painting

Outside Complete.

MBT

Starting on Main Tanks.

MBT

Grinding Paint off Ready for Framework.

MBT

Forward Frame Underway.

MBT

Forward Tank Test Fit.

MBT

Test Fit of Upper and Lower Tanks.

MBT

Making Templates..

MBT

First Side Cut on Lower Structure.

MBT

Mounting Tabs Fitted.

MBT

Upper and Lower Tanks Joined.

MBT

Starting On Aft Tank.

MBT

Cutting Service Hole in Lower Aft Structure.

MBT

Forward Tank Test Fit.

MBT

Service Hole Cut.

Motors

Lining Up Aft Motor.

Motors

Brackets.

Motors

Test Fit of Aft Motor.

MBT

Rubber for MBT Seal.

Motors

Aft Motor Retaining Bracket.

Motors

Frame Motor  Bracket.

Motors

Extended Bottle Screw..