Log

Last updated:  19 September 2013

K-350 Submersible Build Diary

Submersible Build Log

Motors

Motor Steering Linkage Assembled.

Motors

Motor Test Fitted.

Motors

Linkage Complete.

MBT

Viewport Covers Arrive.

Through Hulls

Depth Gauge Through Hull Fitted.

MBT

Main Tanks Return From Re-Fit.

Motors

Wooden Motor Support.

VBT

VBT Re-welded.

Deck

Teak and Deck Template.

Deck

Deck Templates ready for Teak.

Batteries

Batteries Aquired.

Plumbing

Pipe and Tubing Diagram.

Plumbing

Tube Reference.

Plumbing

Valve Reference.

Bumpers

Bumper Brackets Fitted.

Deck

Deck Stuck Down.

Deck

Cutting the Shapes with a Router.

Deck

Test Fit of Deck.

MBT

Viewport Retaining Rings Complete.

Plumbing

Parts Arrive.

Deck

Caulking the Deck Boards.

Deck

Brace for Deck Boards Fitted.

Deck

Trimming the Caulking.

Batteries

Caulking Complete.

Batteries

Test Fit of Batteries.

Plumbing

Manifold Fitted.

Plumbing

Main Valve Bracket.

Plumbing

Pipe Benders.