Log |
Last updated: 19 September 2013 |
K-350 Submersible Build Diary |
Submersible Build Log |
Motors |
Motor Steering Linkage Assembled. |
Motors |
Motor Test Fitted. |
Motors |
Linkage Complete. |
MBT |
Viewport Covers Arrive. |
Through Hulls |
Depth Gauge Through Hull Fitted. |
MBT |
Main Tanks Return From Re-Fit. |
Motors |
Wooden Motor Support. |
VBT |
VBT Re-welded. |
Deck |
Teak and Deck Template. |
Deck |
Deck Templates ready for Teak. |
Batteries |
Batteries Aquired. |
Plumbing |
Pipe and Tubing Diagram. |
Plumbing |
Tube Reference. |
Plumbing |
Valve Reference. |
Bumpers |
Bumper Brackets Fitted. |
Deck |
Deck Stuck Down. |
Deck |
Cutting the Shapes with a Router. |
Deck |
Test Fit of Deck. |
MBT |
Viewport Retaining Rings Complete. |
Plumbing |
Parts Arrive. |
Deck |
Caulking the Deck Boards. |
Deck |
Brace for Deck Boards Fitted. |
Deck |
Trimming the Caulking. |
Batteries |
Caulking Complete. |
Batteries |
Test Fit of Batteries. |
Plumbing |
Manifold Fitted. |
Plumbing |
Main Valve Bracket. |
Plumbing |
Pipe Benders. |