
|
Log |
|
Last updated: 19 September 2013 |
K-350 Submersible Build Diary |

|
Submersible Build Log |
|
Motors |
|
Motor Steering Linkage Assembled. |
|
Motors |
|
Motor Test Fitted. |
|
Motors |
|
Linkage Complete. |

|
MBT |
|
Viewport Covers Arrive. |
|
Through Hulls |
|
Depth Gauge Through Hull Fitted. |
|
MBT |
|
Main Tanks Return From Re-Fit. |
|
Motors |
|
Wooden Motor Support. |

|
VBT |
|
VBT Re-welded. |
|
Deck |
|
Teak and Deck Template. |
|
Deck |
|
Deck Templates ready for Teak. |
|
Batteries |
|
Batteries Aquired. |

|
Plumbing |
|
Pipe and Tubing Diagram. |
|
Plumbing |
|
Tube Reference. |
|
Plumbing |
|
Valve Reference. |
|
Bumpers |
|
Bumper Brackets Fitted. |

|
Deck |
|
Deck Stuck Down. |
|
Deck |
|
Cutting the Shapes with a Router. |
|
Deck |
|
Test Fit of Deck. |

|
MBT |
|
Viewport Retaining Rings Complete. |
|
Plumbing |
|
Parts Arrive. |
|
Deck |
|
Caulking the Deck Boards. |
|
Deck |
|
Brace for Deck Boards Fitted. |
|
Deck |
|
Trimming the Caulking. |
|
Batteries |
|
Caulking Complete. |
|
Batteries |
|
Test Fit of Batteries. |
|
Plumbing |
|
Manifold Fitted. |

|
Plumbing |
|
Main Valve Bracket. |
|
Plumbing |
|
Pipe Benders. |