|
20/05/12 |
|
Business Name |
|
Plumbing |
|
I wasn’t sure where to put the manifold which is the heart of the HP air system. In the end I went for over the aft port viewport as I had welded on a random tab near there. It took me a while to fabricate a mounting bracket for it. The bracket bolts to the tab, then has an “L” shape with a bolt through to tighten it to the next frame. There is a “V” shaped seat to level the manifold up as the bracket is not vertical. The manifold is then cramped to the V bracket via 4 tabs with bolts through. It’s solid, that’s the point. I re-fitted the seat so I could be sure it wasn’t in the way. |


|
Submersible Build Log |
