K-350 Submersible Build Diary

Submersible Build Log

Electrics

12v Panel Replaced.

Through Hulls

Fitting Seals.

VBT

Seals and Linkage Complete.

Dropweights

Seals and Cable Pull Complete.

Dropweights

Drop Test.

Dropweights

Dropweights On.

Motors

Main motor Bladder Fitted.

Motors

Main Motor Installed.

Lights

Lights External Power Test.

Lights

Tapping for Blue Globe Glands.

Lights

Sink Test.

Lights

Lights Mostly Complete.

Instruments

Internal Lights Complete.

Through Hulls

Side Thruster Penetrators Filled.

Life Support

Scrubber Hose Fitted.

Lights

Light Brackets Complete.

Lights

Lights Attached.

Lights

Lights Switched On.

Through Hulls

Trying to Cure the Epoxy Better.

Through Hulls

Breaking the Epoxy Out.

Lights

External Light Connections.

Motors

External Motor Connections.

Through Hulls

Epoxy Experiments.

Skids

Skids On.

Lights

Complete and Assembled.

Through Hulls

Epoxy Test Procedure.

Through Hulls

Epoxy Test Results,

Through Hulls

New Epoxy and Sealing Method.

Motors

Fitting Compensating Tubes.

Motors

Side Motors Complete.

Motors

Fitting Motor Through Hulls.

Motors

Soldering Connections.