30/03/13 |
Business Name |
Motors |
Submersible Build Log |
Screwed in the through hull shafts with PTFE tape. It was awkward to make threaded connectors (again out of 6mm tube) for the cables. I threaded a 10mm length of tube, M5 and then soldered the cable to one end and screwed it onto the brass rods. Finally, once I was happy it was a good connection and had electrical continuity, I filled the void with epoxy. They are not coming out. |