|
Hatch |
|
25/11/07 |
|
The hatch ring and dish are set ready to weld. I have cramped the ring down flat to the granite flatbed. The dish has been carefully positioned and I have raised the dish up 1mm by using pieces of welding wire to create a small gap. This will allow the first root run to penetrate better through the 1mm gap. |




|
Submersible Build Log |