Rings

27/10/07

The part is done.  It is the same on the other side of the tower. I could not weld from the other side of the piece, so I was careful to fillet the pieces to allow good penetration of the weld.  Somehow the triangles look really tiny in this picture, but just of the top of my head without actually measuring them, A is about 90mm and B 70mm.  I don’t know if this is the right thing to do here or not, but I don’t think it can hurt.

Submersible Build Log