Tower Base

23/9/07

I’m tacking the tower base into place at last.  Not shown is the leveling up.  Out came the plumb line again to make sure the hull was exactly vertical.  Then the spirit level to level up the hull horizontally.  And the spirit level across the top of the tower base to get it right, relative to the hull.  Plus, it had to drop down into the hull to the correct place to meet with the three rings on the inside.  It took a while.

Submersible Build Log