Tower Base

20/8/07

I’m now positioning the tower base into the correct place ready to be marked and cut.  The tower is back on the chain hoist and I have re-welded the bar back on so I can lower it into place.  The one reinforcing ring that goes in the centre of this tower base has its ends butted up to the bottom of the base.  As such, there is a fair bit to cut out, so I cut a small piece to the correct angle and used that to see how the ring will butt up against the tower.  Its down a little to much in this picture.

Submersible Build Log