

|
Tower Base |
|
7/8/07 |
|
Here the tower base is about 3/4 of the way down into the hole. A bit more grinding is still needed. It’s obviously better to cut the hole slightly smaller and grind to fit, rather than cut it too big. |


|
Submersible Build Log |