Tower Base

7/8/07

Now I’m grinding out the hole to ensure a good fit.  I had to lower the tower base down into the hole, mark where it was still touching and grind it out.  This took about 3.5 hours and probably about 20 lifts in and out with the chain hoist.

Submersible Build Log