4/7/07

Power

Finally the new power socket has been installed.  Its taken 2 months of waiting!  Anyway, its done so I can now use the new welder.  The house has a 3 phase supply at the head.  Only one of the phases was being used for the house, so I was able to have one of the others wired directly into the 63amp single phase socket at the bottom.  They had to install a new 3 phase meter, circuit breaker, fuse box and update all the earth cables, which is why it took so long.