Battery Pods

09/01/09

I first welded on a strip of 10mm plate so I could hold the pipe on the centre (I’ll cut this off later).  Then used a plunger dial gauge set against the side of the tube near the cladding to get the tube as concentric as possible.  Then centre drilled the plate and fitted the revolving centre to hold everything nice and solid.  Then started on the machining.

Submersible Build Log