|
28/7/07 |

|
Submersible Build Log |
|
Guernsey SubmarIne |

|
Tower Base |
|
The two coke cans are to lift the spirit level over the bar I welded on. I needed two things that were exactly the same size to get the level across the centre. I’m projecting down with a straight ruler to mark the hole ready for cutting. My Dad is assisting. |

