
|
Submersible Build Log |
|
Guernsey SubmarIne |
|
Log |
|
Last updated: 04 March 2010 |
K-350 Submersible Build Diary |

|
Battery Pods |
|
Vents Threaded. |
|
Battery Pods |
|
Pod Cladding. |
|
Battery Pods |
|
Pod Cladding Nearly Done. |
|
Battery Pods |
|
Cladding Removed. |
|
Through Hulls |
|
Fitted in.. |

|
Through Hulls |
|
Preheating.. |
|
Elec. Through Hulls |
|
Starting on Electrical Through Hulls. |
|
Through Hulls |
|
Cutting the Holes. |

|
Elec. Through Hulls |
|
Complete. |
|
Elec. Through Hulls |
|
UHMWPE. |
|
Battery Pods |
|
Battery Pod Sealing System No. 2. |
|
Elec. Through Hulls |
|
Boring Through Hulls. |
|
Battery Pods |
|
Drilling Pod Rings. |

|
Battery Pods |
|
Facing Done. |
|
Battery Pods |
|
Facing New Pod Rings. |
|
Battery Pods |
|
Preparing Endcap Holder. |
|
Battery Pods |
|
Turning Holder. |
|
Battery Pods |
|
Ready for Rings. |

|
Battery Pods |
|
Welding on the Rings. |
|
Battery Pods |
|
Nearly Complete. |
|
Battery Pods |
|
Machining the Pod Caps. |
|
Machining the Bore. |
|
Machining the Valve Top. |
|
Overpressure Valve |
|
Machining the Top Taper. |
|
Overpressure Valve |
|
Drilling the Vent Holes. |

|
Battery Pods |
|
O’ Ring Grooves are Complete. |
|
Overpressure Valve |
|
Complete. |
|
Battery Pods |
|
Tray Locking Bar. |
|
Battery Pods |
|
Test Fit Up. |
|
Overpressure Valve |
|
Motor Thr. Hull |
|
Side Thrusters |
|
Have Arrived. |