K-350 Submersible Build Diary |
Submersible Build Log |
Plumbing |
Variable Tank Plumbing. |
Gauges |
Depth Gauges Fitted. |
VBT |
Mounting VBT Underneath. |
Plumbing |
Pipe Bending. |
Plumbing |
Internal Plumbing Complete. |
Plumbing |
VBT Plumbing Problem. |
Plumbing |
PTFE Seals. |
Through Hulls |
Main Vent Valve Extension Seals. |
VBT |
Delrin Washers. |
VBT |
Valve Linkage. |
Electrics |
Main Battery Switch and Breaker Panel. |
Electrics |
Panel Layout. |
Elec. Through Hulls |
Modifying the Elec. Through Hulls. |
Elec. Through Hulls |
Elec. Through Hulls Complete. |
Electrics |
Motor Controller Panel. |
VBT |
Valve Linkage Knob Added. |
Plumbing |
Flood Falve Fitted. |
Dropweights |
Pull Cable Installed. |
Electrics |
Mains Panel Fitted. |
Electrics |
Battery Check. |
Electrics |
Installing Batteries. |
Electrics |
Port Side Batteries Fitted. |
Electrics |
Crimping Tool. |
Elec. Through Hulls |
Sub Conn Penetrator On. |
Electrics |
Main Electrical Panel Complete. |
Electrics |
Main Wiring Complete. |
Electrics |
Motor Controller Panel Fitted. |
Electrics |
New Charger Running. |