23/09/12 |
Business Name |
MBT |
I fitted the aft main tank and lower fairing. Took a while but fairly straight forward. I also made the securing straps for both fore and aft. Just a simple rolled steel flat with an angle welded on at the bottom and a bolt through. Exactly as per the plans. The worst job was polishing them up. |
Submersible Build Log |