23/09/12

Business Name

MBT

I fitted the aft main tank and lower fairing.  Took a while but fairly straight forward.  I also made the securing straps for both fore and aft.  Just a simple rolled steel flat with an angle welded on at the bottom and a bolt through.  Exactly as per the plans.  The worst job was polishing them up.

Submersible Build Log