14/10/10

Business Name

Drop Weights

This is a series of pictures of the pour.  I tried to start off slow, but it was starting to go cold as it went in so I had to pour it quicker.  I should have thought of the splash earlier, so mid pour, I quickly grabbed a piece of wood to try to deflect most of the splash back into the mould.  Once the level got over the piece of channel, it flowed much easier.  Bottom picture is of it done.  I didn't spill too much and most that did spill was easily picked up later when it was cold.

Submersible Build Log