05/09/11

Business Name

MBT

I went to have another look at how the main tanks are coming along.  This is the mould and there is tank number three inside setting.  I have asked them to make four “halves” as opposed to just the standard two shown on the plans.   This is so I can style the tanks better.

Submersible Build Log