30/03/13

Business Name

Motors

Submersible Build Log

Screwed in the through hull shafts with PTFE tape. 

It was awkward to make threaded connectors (again out of 6mm tube) for the cables.  I threaded a 10mm length of tube, M5 and then soldered the cable to one end and screwed it onto the brass rods.

Finally, once I was happy it was a good connection and had electrical continuity, I filled the void with epoxy.  They are not coming out.