01/02/13 |
Business Name |
VBT |
I re-fitted the VBT linkage with the through hull properly installed. Thie linkage felt a bit “loose” when I originally made it but now its all bolted together properly, its not too bad. Still not ideally located but it works ok. |
Submersible Build Log |