01/02/13

Business Name

VBT

I re-fitted the VBT linkage with the through hull properly installed.  Thie linkage felt a bit “loose” when I originally made it but now its all bolted together properly, its not too bad.  Still not ideally located but it works ok.

Submersible Build Log