| 
   15/09/12  | 
 
| 
   Business Name  | 
 
| 
   Plumbing  | 
 
| 
   I fitted up one of the tanks to the system and tested it out. I wound the dial from outside through a viewport incase something went wrong. Pumped it to full tank pressure which was as these were filled, 200 bar. The system is designed for 300. There was not a single leak, not one. I was very pleased with that.  | 
 


| 
   Submersible Build Log  | 
 
